The ProcessChangeoverPrognosisType is a prognosis indicating at which time in the future the machine has to be prepared for its next manufacturing process. This might e.g., be the change of a fixture within the machine. It can also be used to group different manual steps like tool changes and loading new parts when done between processes, usually given as setup instruction.
The ProcessChangeoverPrognosisType is formally defined in Table 76.
Table 76 – ProcessChangeoverPrognosisType Definition
Attribute |
Value |
||||
BrowseName |
ProcessChangeoverPrognosisType |
||||
IsAbstract |
False |
||||
References |
Node Class |
BrowseName |
DataType |
TypeDefinition |
Other |
Subtype of the PrognosisType defined in 8.6.4 i.e. inheriting the InstanceDeclarations of that Node. |
|||||
0:HasComponent |
Variable |
Activity |
0:LocalizedText |
0:BaseDataVariableType |
M, RO |
0:HasComponent |
Variable |
Location |
0:LocalizedText |
0:BaseDataVariableType |
M, RO |
Conformance Units |
|||||
MachineTool PrognosisType |
|||||
MachineTool Prognoses Dynamic List |
Activity indicates the specific task(s) to perform or the indication of the setup instruction.
Location is the place where the activity for the process changeover is located within the machine. This may for example be the indication and number of the working area.