7 Predefined Job-Order-Input and Job-Order-Response Information

7.1 Overview

ISA95 job control (OPC 10031-4) defines mechanisms to add job order information using the 3:ISA95JobOrderDataType and mechanisms for getting the result or status of the job order using the 3:ISA95JobResponseDataType. Both DataTypes define arrays of properties of a job order: general, personnel, equipment, physical assets, and material. The 3:ISA95JobOrderDataType uses the general properties to describe the job order and the other properties to define the requirements, whereas the 3:ISA95JobResponseDataType uses the general properties to describe the output and the other properties to provide information on what has been used.

OPC 40001-3 (Machinery Job Mgmt) standardizes some of these parameters, which are application-specific from the perspective of OPC 10031-4. This specification gives recommendations for using these parameters and defines additional parameters.

7.2 Relevant Predefined Parameters

The PlannedQuantityOfRuns should not be used. Instead, use Material.Quantity and RunsPlanned.

The PlannedOrderQuantity should not be used. Instead, use Material.Quantity and RunsPlanned.

The predefined 3:JobOrderParameters of OPC 40001-3 in Table 27 should be used if the relevant information is available:

Table 28 provides predefined key-value pairs for 3:JobOrderParameters and 3:JobResponseData, and indicates the data structure in which the key-value pairs are expected to be used. An “X” in “In” indicates that it may be used in 3:JobOrderParameters; an “X” in “Out” indicates that it may be used in 3:JobResponseData.