7.2 Relevant Predefined Parameters

The PlannedQuantityOfRuns should not be used. Instead, use Material.Quantity and RunsPlanned.

The PlannedOrderQuantity should not be used. Instead, use Material.Quantity and RunsPlanned.

The predefined 3:JobOrderParameters of OPC 40001-3 in Table 27 should be used if the relevant information is available:

Table 28 provides predefined key-value pairs for 3:JobOrderParameters and 3:JobResponseData, and indicates the data structure in which the key-value pairs are expected to be used. An “X” in “In” indicates that it may be used in 3:JobOrderParameters; an “X” in “Out” indicates that it may be used in 3:JobResponseData.