OPC Foundation
  • Documents
  • NodeSets
  • Search
9 Predefined Job-Order-Input and Job-Order-Response Information

OPC 40001-3 and OPC 40501-1 define Job-Order-Input and Job-Order-Response information for the use case of 10:JobManagement on a machine.

This specification adds some standardized parameters, which are application-specific from the view of OPC 40540.

9.1 Predefined JobOrderParameters and JobResponseData

Table 21 – Predefined JobOrderParameters and JobResponseData

ID

DataType of Value

Description

EngineeringUnits

Subparameters

In

Out

LayersPlanned

0:UInt32

Indicates how many layers are needed in order to successfully finish the job

-

-

x

-

Runs

RunInfoDataType[]

Array of job runs, which contain unique run identifiers and current layer counts.

-

-

-

x

9.2 Material

Table 22 – Predefined additional Properties for ISA95MaterialDataType

ID

DataType of Value

Description

EngineeringUnits

Subparameters

In

Out

Feedstock

0:NodeId

Used to reference the feedstocks managed by the EquipmentAMType that are used to produce this part.

-

-

x

x

Please report errors or issues with the site to webmaster.

Copyright © 2025 - OPC Foundation