Search
3 result(s) for Preparing
-
OPC-10000-100 – OPC Unified Architecture - Part 100: Devices8.4.8.2 PercentCompletenumber between 0 and 100 that informs about the progress in the Preparing or the Resuming States . It can be used whenever the activity takes longer and the user should
-
OPC-10000-100 – OPC Unified Architecture - Part 100: Devices8.4.8.3 Prepare Methodprepare a device for an update. This call transitions the device into the state Preparing . After the preparation is complete the state machine can perform an automatic transition
-
OPC-10000-100 – OPC Unified Architecture - Part 100: Devices8.4.8.4 Abort Methodclient can use the Abort Method to bring the state machine from Resuming or Preparing back to the Idle state. This can be necessary, if the preparation takes too long ... call transitions the device back to the Idle state. Note: If the transition from Preparing to Idle cannot complete instantly a Client can subscribe for the events or the state