Search
2 result(s) for IdleToIdle
-
OPC-40010-1 – OPC UA for Robotics - Part 1: Vertical Integration7.12.3 GetReady Methodwill transition from Idle to Ready . If the internal preparations are unsuccessful then the IdleToIdle transition occurs. In conjunction with the usage of this method, the transient states
-
OPC-40010-1 – OPC UA for Robotics - Part 1: Vertical Integration7.16.2 LoadByNodeId Methodcalled, and something goes wrong internally then instead of the IdleToReady transition, the IdleToIdle transition shall be observed by the client. If the system is already in the Ready state