9 Management of Jobs with job groups and jobs ToC Previous Next

9.3 JobType ToC Previous Next

9.3.7 Sequence ToC Previous Next

Planned sequence when the job group contains multiple job for one strand. When there is only one job for a string in the production group the value is always 1.

Previous Next