9 Management of Jobs with job groups and jobs ToC Previous Next

9.3 JobType ToC Previous Next

9.3.6 Strand ToC Previous Next

Strand is used when several products (two pipes is parallel, foil cut into several smaller foils) are produced in parallel. When only one product is produced at the same time, the value is always 1.

Previous Next