9 Management of Jobs with job groups and jobs ToC Previous Next

9.3 JobType ToC Previous Next

9.3.10 LotSize ToC Previous Next

Size of a production lot. This used to control the

  • frequency of the Events of LotFinishedEventType (see 9.3.19)
  • production of different jobs in a group: When LotSize is reached, the next job in the group is produced (see examples in Annex).

Previous Next