9 Management of Jobs with job groups and jobs ToC Previous Next

9.2 JobGroupType ToC Previous Next

9.2.9 PlannedProductionTime ToC Previous Next

Planned time for the production of the job group. If not relevant the value shall be 0.

Previous Next