9 Management of Jobs with job groups and jobs ToC Previous Next

9.2 JobGroupType ToC Previous Next

9.2.8 PlannedStart ToC Previous Next

Planned start of the job (in UTC time). If not relevant the value shall be 0.

Previous Next