9 Management of Jobs with job groups and jobs

9.2 JobGroupType

9.2.9 PlannedProductionTime

Planned time for the production of the job group. If not relevant the value shall be 0.
Online versions of OPC UA specifications and information models.
Planned time for the production of the job group. If not relevant the value shall be 0.