9 Management of Jobs with job groups and jobs

9.2 JobGroupType

9.2.10 PlannedSetUpTime

Planned total time needed for set up and tear down of the extrusion line for the job group. If not relevant the value shall be 0.
Online versions of OPC UA specifications and information models.
Planned total time needed for set up and tear down of the extrusion line for the job group. If not relevant the value shall be 0.