1 Scope
2 Normative references
3 Terms, definitions and conventions
3.1 Overview
3.2 Abbreviated Terms
3.3 Conventions used in this document
4 Application and Use Cases of OPC 40569-1: Longwall Operation
4.1 Application Case Longwall Operation
4.2 Use Cases for the AC Longwall Operation
4.2.1 Use Case Initialization
4.2.2 Use Case Shield Advance
4.2.3 Use Case Push AFC
4.2.4 Use Case Conveying
4.2.5 Use Case Anti-Collision
4.2.6 Use Case Face Alignment
4.2.7 Use Case Horizon Control