The ManualActivityPrognosisTypeis a prognosis indicating at which time in the future a manual intervention may become necessary.
An example for a manual intervention is a measurement or control activity, which needs to be carried out during the run of the program.
The ManualActivityPrognosisTypeis formally defined in Table 68.
Table 68– ManualActivityPrognosisType Definition
Attribute |
Value |
||||
BrowseName |
ManualActivityPrognosisType |
||||
IsAbstract |
False |
||||
References |
Node Class |
BrowseName |
DataType |
TypeDefinition |
Other |
Subtype of the PrognosisTypedefined in 8.6.4i.e. inheriting the InstanceDeclarations of that Node. |
|||||
0:HasComponent |
Variable |
Activity |
0:LocalizedText |
0:BaseDataVariableType |
M, RO |
Conformance Units |
|||||
MachineTool PrognosisType |
|||||
MachineTool Prognoses Dynamic List |
Activityindicates the specific maintenance task to perform.