The ProcessChangeoverPrognosisTypeis a prognosis indicating at which time in the future the machine has to be prepared for its next manufacturing process. This might e.g. be the change of a fixture within the machine. It can also be used to group different manual steps like tool changes and loading new parts when done between processes, usually given as setup instruction.

The ProcessChangeoverPrognosisTypeis formally defined in Table 71.

Table 71– ProcessChangeoverPrognosisType Definition

Attribute

Value

BrowseName

ProcessChangeoverPrognosisType

IsAbstract

False

References

Node Class

BrowseName

DataType

TypeDefinition

Other

Subtype of the PrognosisTypedefined in 8.6.4i.e. inheriting the InstanceDeclarations of that Node.

0:HasComponent

Variable

Activity

0:LocalizedText

0:BaseDataVariableType

M, RO

0:HasComponent

Variable

Location

0:LocalizedText

0:BaseDataVariableType

M, RO

Conformance Units

MachineTool PrognosisType

MachineTool Prognoses Dynamic List

Activityindicates the specific task(s) to perform or the indication of the setup instruction.

Locationis the place where the activity for the process changeover is located within the machine. This may for example be the indication and number of the working area.