9 Management of Jobs with job groups and jobs ToC Previous Next

9.2 JobGroupType ToC Previous Next

9.2.10 PlannedSetUpTime ToC Previous Next

Planned total time needed for set up and tear down of the extrusion line for the job group. If not relevant the value shall be 0.

Previous Next